- SHELAA 2026 - Methodology (incl. Appendix A) ( PDF - 513.3 KB)
- SHELAA 2026 Appendix B - Footnote 7 Assessments ( PDF - 71.81 KB)
- SHELAA 2026 Appendix C - Suitable - Policy GT1 Gypsy and Traveller Allocations ( PDF - 3.56 MB)
- SHELAA 2026 Appendix C - Suitable - Policy ST2 Urban Site Allocations ( PDF - 26.8 MB)
- SHELAA 2026 Appendix C - Suitable - Policy ST5 Other Greenfield Major Site Allocations ( PDF - 2.88 MB)
- SHELAA 2026 Appendix C - Suitable - Policy EMP2 Employment Allocations ( PDF - 6.42 MB)
- SHELAA 2026 Appendix C - Suitable - Policy ST3 - PDL Site Allocations ( PDF - 13.7 MB)
- SHELAA 2026 Appendix C - Suitable - Policy ST4 - Greenfield Grey Belt Allocations ( PDF - 37.2 MB)
- SHELAA 2026 Appendix D - Unsuitable Sites ( PDF - 59.9 MB)
- SHELAA 2026 Appendix E - ADMP Allocations ( PDF - 51.23 KB)
- SHELAA 2026 Appendix F - Sites Contrary to Strategy ( PDF - 469.53 KB)
- SHELAA 2026 Appendix G - Discounted Sites ( PDF - 101.81 KB)
Early start for waste collections during the heatwave
With more high temperatures forecast this week, we will start our waste collections earlier than normal until Friday 14 August 2026.
View details